We source development land and hand it over with the Biodiversity Net Gain position already worked out — baseline run, shortfall costed, units identified and reservable. You get the real number on day one, not after you've spent fifteen grand finding it out.
BNG is quietly killing deals, and it shows up late
Since it became mandatory, the industry's own numbers tell the story:
of home builders have declined sites they'd previously have bought — because of BNG
report planning delays caused by BNG
say their council hasn't got the resource or expertise to process it
still find BNG challenging
Source: Home Builders Federation member survey, 2026.
BNG is a pre-commencement condition. No approved gain plan, no ground broken — and development finance drawdown is usually conditional on discharging pre-commencement conditions. So the site sits there, the condition sits there, and interest accrues on land you've already bought.
What lands in your inbox
Not a postcode and a guess. Every site we send comes with the work already done.
The site
Title numbers, ownership, boundary, acreage, constraints, planning history and allocation status.
The habitat baseline
UKHab classification over the site so you know what you're starting from — not a guess from an aerial photo.
The shortfall
Baseline units, what the scheme costs you in units, and the gap you actually have to fill.
The cost to fix it
What those units cost, from named suppliers in your catchment, with lead times. Sense-checked against the statutory credit ceiling so you know you're not being had.
The supply
Which registered habitat banks serve this catchment, what they hold, and whether we can reserve it.
The all-in number
Land plus BNG plus fees. The figure your appraisal actually needs.
Who we work with
SME developers
75–200 unit schemes. You haven't got an in-house ecologist and you don't want one.
Developers who are stuck
Consent granted, ground not broken, BNG condition undischarged. We'll find the units and get it moving.
Landowners
If your land has a watercourse, degraded grassland or heath on it, it may be worth materially more than you think. Worth a conversation.
The rules changed on 6 August 2026 — sites of 0.2ha or under are now exempt, unless priority habitat is affected. There's another consultation outstanding on brownfield. We track this properly, and if a site doesn't need BNG at all, we'll tell you that too. It's cheaper for everyone than finding out at condition discharge.
Tell us the catchment. We'll tell you what's in it.